anyHost Datacenter | Generator Test 14.1./11.2.2017
During generator test from 14.01.2017 at amyHost Datacenter some batteries of UPS 3 (N+1 Setup) failed.
Due to this failure we switched back to the main power. No customer service was impacted.
The vendor was on place and conformed the failure of the batteries.
The new batteries are ordered and installed in the next weeks.
The UPS redundancy is guaranteed at any time.
We decided to postpone the:
Generator Test from Data Center B20 (Bonnstrasse 20) to 11.02.2017 at 08:00.
Thanks for understanding.
Maintenance window:
* Date: 2017-01-14 08:00- in running mode
* Date: 2017-02-11 08:00- in running mode
For questions related to this, you can contact us
Wenn Sie Fragen dazu haben lassen Sie sich durch einen Reseller beraten oder rufen Sie uns an:
http://www.anyhost.ch/index.php/5ueberuns/kontakt
Während den Bürozeiten, FON: +41 32 512 14 90
anyHost Datacenter
TOC (Technical Operation Center)
Januar 2017