Please be advised that we will be performing the generator load test at our Data Center A6.
A good preventive maintenance program preserves assets, keeps things running in optimum condition, avoids both long and short term losses and helps insure that maximum life expectancy is achieved.
So Generator tests are one of the key approaches in the preventive maintenance program.
With this test all functions of the power system will be tested under load including alerting and automatic re-fueling.
This is a routine test of the generators which will be performed in a controlled manner.
During the test, customer load from Powernetwork "A" will be transferred from Utility to the Generators.
If attending site you may notice the Air Handling Units and Lighting will go off momentarily within the Data Center.
We expect no degradation of power in the data center.
This test affect only one of the two power networks:
Activities Type:
[x] Preventive Maintenance Activities
[ ] Other Activities
Description/Activities:
* Generatortest with Datacenterload Powernetwork A
DataCenter:
* anyHost_Datacenter (A6)
Outage risk:
[ ] expected impact for customer
[x] no expected impact
If expected impact:
-
Maintenance window:
* Date: 2017-07-22 08:30-10:30 (Switzerland local time UTC+2 summer time)
For questions related to this, you can contact us
Wenn Sie Fragen dazu haben lassen Sie sich durch einen Reseller beraten oder rufen Sie uns an:
http://www.anyhost.ch/index.php/5ueberuns/kontakt
Während den Bürozeiten, FON: +41 32 512 14 90
anyHost Datacenter
TOC (Technical Operation Center)